Works Completed – M/s Makin Developers Private Limited |
||||||
SL No | Name of work | Amount of contract (In Lakhs) |
Owners or Sponsoring Organization | Date of commencement | Date of Completion |
Name and address/ telephone number of officer to whom reference may be made |
1 | Construction of Chemical Recovery Plant 500 MT Evaporator, Power Plant, Ash Silos, ETP, MCC, Deaerator, ESP, Lime Godown, WLL at Hoshiarpur (Punjab) for KUANTUM PAPER LIMITED |
980.00 | KUANTUM PAPER LIMITED Regd. Corporate Head Office: W1A Godrej Eternia 70 Indl Area Phase I Chandigarh 160 002 |
01.01.2019 | 30.04.2021 | KUANTUM PAPER LIMITED Regd. Corporate Head Office: W1A Godrej Eternia, 70 Indl Area Phase I Chandigarh 160 002 |
2 | Construction Of Three Storey (G+2) 52 Bedded Hospital Building On Account Of Demolish Of Existing Building In Srinagar (Garhwal) In Connection With Rishikesh-Karanprayag New Bg Rail Link Project In The State Of Uttarakhand, India | 1,651.00 | Rail Vikas Nigam Limited RVNL Office Building, Opp. GST Bhavan, Next to GMVN, Shyampur Bypass Road, Rishikesh – 249201 |
16.01.2019 | 15.04.2021 | Rail Vikas Nigam Limited RVNL Office Building, Opp. GST Bhavan, Next to GMVN, Shyampur Bypass Road, Rishikesh – 249201 |
3 | Construction of M/s Allied Blenders And Distillers Pvt. Ltd Proposed Imfl Bottling Plant At Derabassi (Punjab) | 405.00 | M/s Allied Blenders And Distillers Pvt. Ltd Ashford Centre, 3rd and 4th floor, Shankarrao Naram Marg, Lower Parel (W), Mumbai-400013. Registered Office: 394/C, Ground Floor, Lamington Chambers, Lamington Road, Mumbai-400004, India. |
25.04.2019 | 30.12.2020 | M/s Allied Blenders And Distillers Pvt. Ltd Ashford Centre, 3rd and 4th floor, Shankarrao Naram Marg, Lower Parel (W), Mumbai-400013. T.: +91-22-43001111 Registered Office: 394/C, Ground Floor, Lamington Chambers, Lamington Road, Mumbai-400004, India. T.: +91-22-67779777 |
4 | CONSTRUCTION OF BCS INDIA PRIVATE LIMITED AT LUDHIANA (PUNJAB) | 412.00 | BCS India Private Limited Vill. Manngarh, P.O Kohara, Machiwara Road, Distt. Ludhiana – 141112 (Punjab) India |
12.08.2019 | 30.12.2020 | BCS India Private Limited Vill. Manngarh, P.O Kohara, Machiwara Road, Distt. Ludhiana – 141112 (Punjab) India Telefax: +91-161-2848598, Tel.: +91-161-2848597 |
5 | CONSTRUCTION OF DISTRICT INSTITUTE AZIM PREMJI FOUNDATION FOR DEVELOPMENT DEHRADUN | 373.00 | Azim Premji foundation for Development 134, Doddakkannelli, Next to Wipro Corporate office, Sarjapura Road Bengaluru KA 560035 |
01.04.2019 | 30.11.2020 | Azim Premji foundation for Development 134, Doddakkannelli, Next to Wipro Corporate office, Sarjapura Road Bengaluru KA 560035 |
6 | Construction of Shri Kesri Singh Barath Charan Seva Sansthan | 446.00 | Shri Kesri Singh Barath Charan Seva Sansthanand Regd. Office: 290, Hanwant A, BJS Colony, Poata C Road Jodhpur (Raj) – 342003 |
06.02.2019 | 06.07.2020 | Shri Kesri Singh Barath Charan Seva Sansthanand Regd. Office: 290, Hanwant A, BJS Colony, Poata C Road Jodhpur (Raj) – 342003 |
7 | Proposed Expansion Of Factory Building for Parle Agro Pvt. Ltd. at Sitarganj, Dist. Udhamsinghnagar (Uttarakhand) | 1,599.00 | Parle Agro Pvt Ltd Regd. Corporate Head Office: Off Western Express Highway, Sahar – Chakala Road, Parsiwada, Andheri (E), Mumbai 400 099 |
26.03.2019 | 30.07.2020 | Parle Agro Pvt Ltd Regd. Corporate Head Office: Off Western Express Highway, Sahar – Chakala Road, Parsiwada, Andheri (E), Mumbai 400 099, T.: 022 67348000 |
8 | PROPOSED FACTORY FOR M/s MANOHAR PACKAGINGS PVT LTD AT RAJPURA – (PUNJAB) | 1,348.97 | Manohar Packagings Pvt Ltd Corporate Office: 301, Fortune Classic, 15th Road Junction, Khar (West), Mumbai-400052 |
06.09.2018 | 31.11.2019 | Manohar Packagings Pvt Ltd Corporate Office: 301, Fortune Classic, 15th Road Junction, Khar (West), Mumbai-400052 |
9 | Construction of Civil and Structural work for Potent Plant & Harmone Block for Intas Pharmaceutical at Selaqui, Dehradun, (Uttarakhand) | 1,586.00 | M/s Intas Pharmaceuticals Limited Corporate Office – 2nd Floor, Chinubhai Centre, Ashram Road, Ahmedabad – 380009 |
20.04.2017 | 15.12.2019 | M/s Intas Pharmaceuticals Limited Corporate Office – 2nd Floor, Chinubhai Centre, Ashram Road, Ahmedabad – 380009 |
10 | Construction of new shed at International Tractors Limited, (A Group of Sonalika Tractors) Village Chak Gujran, Jalandhar Road, Hoshiarpur, Punjab | 998.00 | International Tractor Ltd Head Office & Plant Village Chak Gujran, P.O Piplanwala, Jalandhar Road, Hashiarpur, Punjab – 146022 |
25.05.2018 | 31.10.2019 | International Tractor Ltd Head Office & Plant Village Chak Gujran, P.O Piplanwala, Jalandhar Road, Hashiarpur, Punjab – 146022 |
11 | Construction for general building works, includes external development & public health at Hoshiarpur for M/s Ludhiana Beverages Pvt. Ltd (Coca-Cola) | 3,048.86 | M/S Ludhiana Beverages Private Limited G T Road, Ludhiana – (Punjab) | 14.02.2018 | 16.08.2019 | M/S Ludhiana Beverages Pvt. Ltd. GT Road, Ludhiana – (Punjab) |
12 | Construction of Quality Control facility for M/s Akorn (American Pharma Co.) at Paonta Sahib, Himanchal Pradesh) | 1,301.00 | Akorn India Pvt. Ltd. 4th Floor, Tower-9B, DLF- Cyber City, Gurgaon-122002, Haryana |
18.05.2016 | 31.12.2018 | Akorn India Pvt. Ltd. 4th Floor, Tower-9B, DLF- Cyber City, Gurgaon-122002, Haryana |
13 | Construction of Factory and Ancilliary Buildings for Mrs. Bectors Food Specialties Limited, Rajpura (Punjab) |
1750 (Without Cost of Cement & Steel) |
Bectors Food Specialties Limited, 8th Floor Vatika Tower, Sector 54, Golf Course Road, Gurgaon – 122002 |
19.05.2017 | 30.07.2018 | Bectors Food Specialties Limited, 8th Floor Vatika Tower, Sector 54, Golf, Course Road, Gurgaon – 122002 |
14 | Construction of Ladies Police Station, C.O office, Fire Station and Transit Hostel (Residential Unit) Srinagar, District Pauri Garhwal | 962.61 | Project Implementation Unit Public Building Uttarakhand Disaster Recovery Project First Floor Nageshwati Ayurvedic Hospital Near Rispna Bridge (Rispna Bridge-ISBT Road) Dehradun |
01.04.2016 | 31.03.2018 | Project Implementation Unit Public Building Uttarakhand Disaster Recovery Project First Floor Nageshwati Ayurvedic Hospital Near Rispna Bridge (Rispna Bridge-ISBT Road) Dehradun |
15 | Construction of factory building for Parle agro Pvt. Ltd. | 2924.00 | Parle Agro Pvt. Ltd. Off. Western Express Highway, Sahar-Chakaa Rd. Parsiwada, Andheri (E) Mumbai – 400099 |
01.04.2016 | 16.06.2017 | Parle Agro Pvt. Ltd. Off. Western Express Highway, Sahar-Chakaa Rd. Parsiwada, Andheri (E), Mumbai – 400099 |
16 | CONSTRUCTION OF FIRE STATION AT RATURA IN DISTT. RUDRAPRAYAG (UTTARAKHAND) | 597.00 | PIU – PUBLIC BUILDINGS Uttarakhand Disaster Recovery Project Uttarakhand State Infrastructure Development Corporation Ltd (A Govt. of Uttarakhand Undertaking) First Floor: Nageshwati Ayurvedic Clinic Complex, Near Rispana Bridge, Dehradun – 24800 |
07.03.2016 | 08.06.2017 | PIU – PUBLIC BUILDINGS Uttarakhand Disaster Recovery Project Uttarakhand State Infrastructure Development Corporation Ltd (A Govt. of Uttarakhand Undertaking) First Floor: Nageshwati Ayurvedic Clinic Complex, Near Rispana Bridge, Dehradun – 24800 |
17 | Construction of UMIYADHAM ASHRAM” building at Haridwar | 1,757.56 | Shri Umiya Mataji Sansthan, Unjha (North-Gujrat) |
16.05.2015 | 07.05.2017 | Shri Umiya Mataji Sansthan, Unjha (North-Gujrat) |
18 | Construction of factory building for Century Plyboard India Ltd | 2873 (Without Cost of Cement & Steel) |
Century Plyboards (I) Limited Shop No. 7-F&8-F, city centre, near bus stand Hoshiyarpur-146001 | 26.03.2016 | 30.09.2017 | Century Plyboards (I) Limited Shop No. 7-F&8-F, city centre, near bus stand Hoshiyarpur-146001 |
19 | Construction of Factory building for TI Cycles of India. Rajpura, Punjab | 2500.00 | TI Cycles of India Post Bag No. 5, CTH Road, Ambattur, Chennai. |
18.04.2015 | 31.10.2016 | TI Cycles of India Post Bag No. 5, CTH Road, Ambattur, Chennai. |
20 | Construction of residential at haridwar greens, Village Aneki Hetampur, Haridwar Uttarakhand consisting of 13 Towers Nos, D-1, F-1 to F-5, V-12 to V-16 , U-02 & U-08 including finishing works school building. Nursery Wing, Under Ground water Tank and Infra works. | 4,452.00 | Hero Homes.(HERO REALTY PRIVATE LIMITED) E-2 Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016 |
11.06.2013 | 10.09.2016 | Hero Homes.(HERO REALTY PRIVATE LIMITED) E-2 Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016 |
21 | Construction of civil and Road works for M/s Pure & Cure Healthcare Pvt Ltd. (G+3 Storeyed) | 913.00 | Pure & Cure Healthcare Pvt Ltd (Pure & Cure) Plot No. 27,28,29,30 Sector 8-A IIE Sidcul Haridwar (Uttarakhand) | 21.05.2015 | 30.09.2016 | Pure & Cure Healthcare Pvt Ltd (Pure & Cure) Plot No. 27,28,29,30 Sector 8-A IIE Sidcul Haridwar (Uttarakhand) |
22 | Construction of School Building at Haridwar Greens, Village Aneki, Hetampur, Haridwar, Uttarakhand | 491.00 | M/s BML Munjal Foundation Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016 |
30.08.2013 | 27.08.2016 | M/s BML Munjal Foundation Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016 |
23 | Structural Repair & Renovation of ONGC Hospital at Dehradun (Uttarakhand) | 1347.00 | Oil And Natural Corporation Ltd. Department of civil engineering, Tel Bhavan, Dehradun Mr. Rajesh Kumar Sankla, Chief Engineer Contact No: 9410397009 |
19.08.2013 | 06.08.2016 | Oil And Natural Corporation Ltd. Department of civil engineering, Tel Bhavan, Dehradun |
24 | Construction of Residential Apartment (Pearls Paradise) at Dhoran Khas, Dehradun including Civil, Plumbing & Electrical works | 2826.00 (Without Cement & Steel) |
PACL LTD, 1-5 Upper Ground Floors, Antriksh Bhawan, K.G Marg, New Delhi-110001 |
15.12.2011 | 30.11.2015 | PACL LTD, 1-5 Upper Ground Floors, Antriksh Bhawan, K.G Marg, New Delhi-110001 |
25 | Civil Construction and Boundary Wall for Zapfen International at Plot No. 31A, Sector 11, IIE, Ranipur, Haridwar | 819.58 | Zapfen International D-1 & D-2, Rajpur Industrical Estate, Khasra No. 117, Bhagwanpur, Tehsil: Roorkee, Uttarakhand |
13.06.2014 | 20.09.2015 | Zapfen International D-1 & D-2, Rajpur Industrical Estate, Khasra No. 117, Bhagwanpur, Tehsil: Roorkee, Uttarakhand |
26 | Industrial Building for M/s. Prince Industries plot No. 5-B, 5-B1 I.I.E Ranipur Haridwar, U.K. | 680.00 | M/s Prince Industries Plot No. 5-B, 5-B1 I.I.E. Ranipur, Haridwar, Uttarakhand |
15.09.2013 | 31.01.2015 | M/s Prince Industries Plot No. 5-B, 5-B1 I.I.E. Ranipur, Haridwar, Uttarakhand |
27 | Civil & External work for CBU Yard | 408.08 | Mahindra & Mahindra Ltd Automotaive Sector CECM DEPT. Akurli Road, Post Box No. 8582 Kandivali (East ) Mumbai |
03.09.2014 | 02.01 2015 | Mahindra & Mahindra Ltd Automotaive Sector CECM DEPT. Akurli Road, Post Box No. 8582 Kandivali (East ) Mumbai |
28 | Construction of factory building for M/s Malik Lifesciences Pvt. Ltd.at Plot No. 16, Vardhman Industrial Estate Village- Bahadurpursaini, Roorkee, Haridwar (UK) |
985.00 | M/s Malik Lifesciences Pvt. Ltd. Plot No-16, Vardhman Industrial Estate, Vill- Bhadarupur Saini Roorkee (U.K.) |
27.12.2013 | 31.12.2014 | M/s Malik Lifesciences Pvt. Ltd. Plot No-16, Vardhman Industrial Estate, Vill- Bhadarupur Saini Roorkee (U.K.) |
29 | Civil construction work for M/s Translumina Therapeutics, Plot No. 12, Pharma City, Selaqui Industrial Area, Dehradun | 321.00 | Translumina Therapeutics Ground Floor, Metro Tower, LSC, MOR Land, New Rajinder Nagar, New Delhi-110060 |
27.11.2013 | 26.10.2014 | Translumina Therapeutics Ground Floor, Metro Tower, LSC, MOR Land, New Rajinder Nagar, New Delhi-110060 |
30 | Construction of Factory Building for M/s Hamilton Housewares P Ltd. at SIDCUL Haridwar | 547.00 | Hamilton Housewares Pvt. Ltd. Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai |
10.11.2011 | 30.09.2014 | Hamilton Housewares Pvt. Ltd. Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai |
31 | M/s Hindustan Zinc Ltd Pantnagar metal plant at Plot No. 2,3 in Sector -14, SIDCUL, Pantnagar, Udhamsingh Nagar, Uttarakhand |
2464.00 | M/s Hindustan Zinc Ltd Yashad Bhawan, Udaipur, Rajasthan, India |
26.05.2012 | 31.08.2013 | M/s Hindustan Zinc Ltd Yashad Bhawan, Udaipur, Rajasthan, India |
32 | Construction of proposed Jagran Law College Buildings/Campus Dehradun |
1180.00 | Jagran School of Law Plot No. 3288 Gha, Village Shankarpur Hukumatpur, Vikas Nagar, Dehradun, Uttarakhand |
24.04.2012 | 28.02.2013 | Jagran School of Law Plot No. 3288 Gha, Village Shankarpur Hukumatpur, Vikas Nagar, Dehradun, Uttarakhand |
33 | Civil, Structural and Plumbing works for Oral Dosage Formulation Facility of Jubilant Life Sciences Ltd at Roorkee, UK | 500.00 (Without Cement & Steel) |
Jubilant Life Sciences Plot No. 1A, Sector 16A, Noida – 201301 |
18.08.2011 | 22.10.2012 | Jubilant Life Sciences Plot No. 1A, Sector 16A, Noida – 201301 |
34 | Construction of the Grand Hotel at EC Road, Dehradun | 389.00 (Without Cement & Steel) |
The Grand Hotel EC Road, Dehradun Uttarakhand |
01.05.2011 | 30.09.2012 | The Grand Hotel EC Road, Dehradun Uttarakhand |
35 | Civil, plumbing and road work at Plot No. 1 Sector 1, NH-58, Vardhman Industrial Estate, Roorkee Distt., Haridwar, | 850.00 | Akums Drugs & Pharmaceuticals Limited. Plot No. 19-20-21, Sector 6 A, I.I.E., SIDCUL, Haridwar |
12.08.2011 | 31.05.2012 | Akums Drugs & Pharmaceuticals Limited. Plot No. 19-20-21, Sector 6 A, I.I.E., SIDCUL, Haridwar |
36 | Construction of hostels and Residential blocks for M/s. Himgiri Nabh Vishwavidyalaya (Essel Group) | 660.00 | M/s. Himgiri Nabh Vishwavidyalaya (Essel Group) Shishambada, Near SOS, Selaqui, Dehradun-246745 |
01.04.2011 | 31.03.2012 | M/s. Himgiri Nabh Vishwavidyalaya (Essel Group) Shishambada, Near SOS, Selakui, , Dehradun-246745 |
37 | Construction of proposed Factory Cum Office Building at Plot C – 18, Sector – 67, at Noida for United Concepts and Solutions Pvt. Ltd. | 528.00 | M/s United Concepts & Solutins Pvt. Ltd., Plot C – 18, Sector – 67 at Noida | 21.10.2010 | 31.03.2012 | M/s United Concepts & Solutins Pvt. Ltd., Plot C – 18, Sector – 67 at Noida |
38 | Construction of proposed factory building for Kesho Packaging Pvt Ltd at Plot no. 38, Udyog Vihar, Greater Noida | 860.00 | Kesho Packaging Pvt. Ltd. Plot No. 38, Udyog vihar, Greater Noida |
14.05.2011 | 13.03.2012 | Kesho Packaging Pvt. Ltd. Plot No. 38, Udyog vihar, Greater Noida |
39 | Construction of factory building for Sterlite at Plot No 9, Vardhman Industrial Estate, Haridwar –24940 | 1,067.00 | M/s Sterlite Optical Technologies Ltd Plot No 9, Vardhman Industrial Estate, Haridwar –24940 | 20.10.2010 | 17.01.2012 | M/s Sterlite Optical Technologies Ltd Plot No 9, Vardhman Industrial Estate, Haridwar –24940 |
40 | Construction of factory building for M/s SBL Industries Pvt. Ltd | 900.00 | M/s SBL Industries Plot no. – 42, Sector-11 SIDCUL, Haridwar |
01.03.2011 | 31.12.2011 | M/s SBL Industries Plot no. – 42, Sector-11 SIDCUL, Haridwar |
41 | Construction of Academic Block for Icfai Campus at Dehradun | 1550.00 | The Institute of Chartered Financial Analysts of India, 44, Nagarjune Hills, Hyderabad | 01.12.2008 | 31.12.2011 | The Institute of Chartered Financial Analysts of India, 44, Nagarjune Hills, Hyderabad |
42 | Construction of factory building for JNS Instrument Ltd. at Plot No. 15, Industrial Park 4,Begampur, Haridwar | 490.00 | JNS Instrument Ltd, Plot No. 4, Sector 3, IMT Manesar, Gurgaon |
25.04.2009 | 15.05.2011 | JNS Instrument Ltd, Plot No. 4, Sector 3, IMT Manesar, Gurgaon |
43 | Construction of factory building for M/s Maxx Mobile Com munication Pvt. Ltd. | 2,200.00 | M/s Maxx Mobile communication C-3 & D-12, Vardhman Industrial Estate, Haridwar |
01.11.2009 | 30.06.2010 | M/s Maxx Mobile communication C-3 & D-12, Vardhman Industrial Estate, Haridwar |
44 | Costruction of Factory Building at Haridwar (Uttarakhad) for SKF India Ltd | 1,150.00 | SKF Limited Sh. Datey, AB-16, Basement, Safdarjung Enclave, New Delhi-29 |
21.05.2009 | 30.06.2010 | SKF Limited Sh. Datey, AB-16, Basement, Safdarjung Enclave, New Delhi-29 |
45 | Civil works for M/s Psychotropics India Ltd. at plot No. 46 & 49 Sector-6 a, IIE, SIDCUL Industrial Area, BHEL, Ranipur, Haridwar | 400.00 | Psychotropics India Ltd. A-32, DLF, Sector- 11 Faridabad – 121006 |
01.08.2009 | 30.05.2010 | Psychotropics India Ltd. A-32, DLF, Sector- 11 Faridabad – 121006 |
46 | Construction of Proposed factory building on Plot No. 11. Industrial Park-2, Village- Salempur Madood, Haridwar (UK) | 1,000.00 | Munjal Auto Industries Ltd 301, 3rd Floor, Galleria Tower, DLF Phase IV, Gurgaon-122002 |
10.06.2009 | 31.03.2010 | Munjal Auto Industries Ltd 301, 3rd Floor, Galleria Tower, DLF Phase IV, Gurgaon-122002 |
47 | M/s Himalayan Drugs Company | 732.00 (Without Cement & Steel) | Dr S Farooq, President, Himalayan Drugs Company , 2 Turner Road Clement Town, Dehradun – 248002 | 01.10.2008 | 30.06.2009 | Dr S Farooq, President, Himalayan Drugs Company , 2 Turner Road Clement Town, Dehradun – 248002 |
48 | Shri Mahant Indresh Hospital & Mahant College |
1200.00 | Chairman Shri Guru Ram Rai Trust Education Mission, Patel Nagar, Dehradun |
11.11.2007 | 10.04.2009 | Chairman Shri Guru Ram Rai Trust Education Mission, Patel Nagar, Dehradun |
49 | Construction of data centre-II at Greater Noida for M/s Wipro Technologies Ltd | 453 (Without Cost of Cement & Steel) |
M/s Wipro Limited, Plot No. 2,3,4 – Knowledge Park-4, Greater Noida, U.P. |
02.12.2007 | 04.03.2009 | M/s Wipro Limited, Plot No. 2,3,4 – Knowledge Park-4, Greater Noida, U.P. |
50 | Construction of Factory Building for M/s Hamilton Housewares P Ltd. at SIDCUL Haridwar | 290.00 | Hamilton Housewares Pvt. Ltd. Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai |
01.06.2006 | 28.01.2007 | Hamilton Housewares Pvt. Ltd. Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai |