Completed Projects

Works Completed – M/s Makin Developers Private Limited

SL No Name of work Amount of contract
(In Lakhs)
Owners or Sponsoring Organization Date of commencement Date
of Completion
Name and address/ telephone number of officer to whom reference may be made
1 Construction of Chemical Recovery Plant 500 MT Evaporator, Power Plant, Ash Silos, ETP, MCC, Deaerator, ESP, Lime Godown, WLL at Hoshiarpur (Punjab)
for KUANTUM PAPER LIMITED
  980.00 KUANTUM PAPER LIMITED
Regd. Corporate Head Office:
W1A  Godrej Eternia
70  Indl Area Phase I
Chandigarh 160 002
01.01.2019 30.04.2021 KUANTUM PAPER LIMITED
Regd. Corporate Head Office:
W1A  Godrej Eternia, 70  Indl Area Phase I
Chandigarh 160 002
2 Construction Of Three Storey (G+2) 52 Bedded Hospital Building On Account Of Demolish Of Existing Building In Srinagar (Garhwal) In Connection With Rishikesh-Karanprayag New Bg Rail Link Project In The State Of Uttarakhand, India   1,651.00 Rail Vikas Nigam Limited
RVNL Office Building, Opp. GST Bhavan, Next to GMVN, Shyampur Bypass Road, Rishikesh – 249201
16.01.2019 15.04.2021 Rail Vikas Nigam Limited
RVNL Office Building, Opp. GST Bhavan, Next to GMVN, Shyampur Bypass Road, Rishikesh – 249201
3 Construction of M/s Allied Blenders And Distillers Pvt. Ltd Proposed Imfl Bottling Plant At Derabassi (Punjab)   405.00 M/s Allied Blenders And Distillers Pvt. Ltd
Ashford Centre, 3rd and 4th floor, Shankarrao Naram Marg, Lower Parel (W), Mumbai-400013.
Registered Office: 394/C, Ground Floor, Lamington Chambers, Lamington Road, Mumbai-400004, India.
25.04.2019 30.12.2020 M/s Allied Blenders And Distillers Pvt. Ltd
Ashford Centre, 3rd and 4th floor, Shankarrao Naram Marg, Lower Parel (W), Mumbai-400013. T.: +91-22-43001111
Registered Office: 394/C, Ground Floor, Lamington Chambers, Lamington Road, Mumbai-400004, India. T.: +91-22-67779777
4 CONSTRUCTION OF BCS INDIA PRIVATE LIMITED AT LUDHIANA (PUNJAB)   412.00 BCS India Private Limited
Vill. Manngarh, P.O Kohara, Machiwara Road, Distt. Ludhiana – 141112 (Punjab) India
12.08.2019 30.12.2020 BCS India Private Limited
Vill. Manngarh, P.O Kohara, Machiwara Road, Distt. Ludhiana – 141112 (Punjab) India
Telefax: +91-161-2848598, Tel.: +91-161-2848597
5 CONSTRUCTION OF DISTRICT INSTITUTE AZIM PREMJI FOUNDATION FOR DEVELOPMENT DEHRADUN   373.00 Azim Premji foundation for Development
134, Doddakkannelli, Next to Wipro Corporate office, Sarjapura Road
Bengaluru KA 560035
01.04.2019 30.11.2020 Azim Premji foundation for Development
134, Doddakkannelli, Next to Wipro Corporate office, Sarjapura Road
Bengaluru KA 560035
6 Construction of Shri Kesri Singh Barath Charan Seva Sansthan   446.00 Shri Kesri Singh Barath Charan Seva Sansthanand
Regd. Office: 290, Hanwant A, BJS Colony, Poata C Road Jodhpur (Raj) – 342003
06.02.2019 06.07.2020 Shri Kesri Singh Barath Charan Seva Sansthanand
Regd. Office: 290, Hanwant A, BJS Colony, Poata C Road Jodhpur (Raj) – 342003
7 Proposed Expansion Of Factory Building for Parle Agro Pvt. Ltd. at Sitarganj, Dist. Udhamsinghnagar (Uttarakhand)   1,599.00 Parle Agro Pvt Ltd
Regd. Corporate Head Office:
Off Western Express Highway,
Sahar – Chakala Road, Parsiwada,
Andheri (E), Mumbai 400 099
26.03.2019 30.07.2020 Parle Agro Pvt Ltd
Regd. Corporate Head Office:
Off Western Express Highway,
Sahar – Chakala Road, Parsiwada,
Andheri (E), Mumbai 400 099, T.: 022 67348000
8 PROPOSED FACTORY FOR M/s MANOHAR PACKAGINGS PVT LTD AT RAJPURA – (PUNJAB)   1,348.97 Manohar Packagings Pvt Ltd
Corporate Office: 301, Fortune Classic, 15th Road Junction, Khar (West), Mumbai-400052
06.09.2018 31.11.2019 Manohar Packagings Pvt Ltd
Corporate Office: 301, Fortune Classic, 15th Road Junction, Khar (West), Mumbai-400052
9 Construction of Civil and Structural work for Potent Plant & Harmone Block for Intas Pharmaceutical at Selaqui, Dehradun, (Uttarakhand)   1,586.00 M/s Intas Pharmaceuticals Limited
Corporate Office – 2nd Floor, Chinubhai Centre, Ashram Road, Ahmedabad – 380009
20.04.2017 15.12.2019 M/s Intas Pharmaceuticals Limited
Corporate Office – 2nd Floor, Chinubhai Centre, Ashram Road, Ahmedabad – 380009
10 Construction of new shed at International Tractors Limited, (A Group of Sonalika Tractors) Village Chak Gujran, Jalandhar Road, Hoshiarpur, Punjab   998.00 International Tractor Ltd
Head Office & Plant
Village Chak Gujran, P.O Piplanwala, Jalandhar Road, Hashiarpur, Punjab – 146022
25.05.2018 31.10.2019 International Tractor Ltd
Head Office & Plant
Village Chak Gujran, P.O Piplanwala, Jalandhar Road, Hashiarpur, Punjab – 146022
11 Construction for general building works, includes external development & public health at Hoshiarpur for M/s Ludhiana Beverages Pvt. Ltd (Coca-Cola)   3,048.86 M/S Ludhiana Beverages Private Limited G T Road, Ludhiana – (Punjab) 14.02.2018 16.08.2019 M/S Ludhiana Beverages Pvt. Ltd.
GT Road, Ludhiana – (Punjab)
12 Construction of Quality Control facility for M/s Akorn (American Pharma Co.) at Paonta Sahib, Himanchal Pradesh)   1,301.00 Akorn India Pvt. Ltd.
4th Floor, Tower-9B,
DLF- Cyber City,
Gurgaon-122002, Haryana
18.05.2016 31.12.2018 Akorn India Pvt. Ltd.
4th Floor, Tower-9B, DLF- Cyber City,
Gurgaon-122002, Haryana
13 Construction of Factory and
Ancilliary Buildings for Mrs. Bectors Food Specialties Limited, Rajpura (Punjab)
 1750
(Without Cost of Cement & Steel)
Bectors Food Specialties
Limited, 8th Floor Vatika Tower, Sector 54, Golf
Course Road, Gurgaon – 122002
19.05.2017 30.07.2018 Bectors Food Specialties
Limited, 8th Floor Vatika Tower, Sector 54, Golf, Course Road, Gurgaon – 122002
14 Construction of Ladies Police Station, C.O office, Fire Station and Transit Hostel (Residential Unit) Srinagar, District Pauri Garhwal   962.61 Project Implementation Unit Public Building
Uttarakhand Disaster Recovery Project
First Floor Nageshwati Ayurvedic Hospital Near Rispna Bridge (Rispna Bridge-ISBT Road) Dehradun
01.04.2016 31.03.2018 Project Implementation Unit Public Building
Uttarakhand Disaster Recovery Project
First Floor Nageshwati Ayurvedic Hospital Near Rispna Bridge (Rispna Bridge-ISBT Road) Dehradun
15 Construction of factory building for Parle agro Pvt. Ltd.  2924.00 Parle Agro Pvt. Ltd. Off. Western Express Highway, Sahar-Chakaa Rd. Parsiwada, Andheri (E)
Mumbai – 400099
01.04.2016 16.06.2017 Parle Agro Pvt. Ltd. Off. Western Express Highway, Sahar-Chakaa Rd. Parsiwada, Andheri (E), Mumbai – 400099
16 CONSTRUCTION OF FIRE STATION AT RATURA IN DISTT. RUDRAPRAYAG (UTTARAKHAND)   597.00 PIU – PUBLIC BUILDINGS
Uttarakhand Disaster Recovery Project Uttarakhand State Infrastructure Development Corporation Ltd (A Govt. of Uttarakhand Undertaking)
First Floor: Nageshwati Ayurvedic Clinic Complex, Near Rispana Bridge, Dehradun – 24800
07.03.2016 08.06.2017 PIU – PUBLIC BUILDINGS
Uttarakhand Disaster Recovery Project
Uttarakhand State Infrastructure Development Corporation Ltd (A Govt. of Uttarakhand Undertaking)
First Floor: Nageshwati Ayurvedic Clinic Complex, Near Rispana Bridge, Dehradun – 24800
17 Construction of UMIYADHAM ASHRAM” building at Haridwar   1,757.56 Shri Umiya Mataji Sansthan,
Unjha (North-Gujrat)
16.05.2015 07.05.2017 Shri Umiya Mataji
Sansthan, Unjha (North-Gujrat)
18 Construction of factory building  for Century Plyboard India Ltd  2873
(Without Cost of Cement & Steel)
Century Plyboards (I) Limited Shop No. 7-F&8-F, city centre, near bus stand Hoshiyarpur-146001 26.03.2016 30.09.2017 Century Plyboards (I) Limited Shop No. 7-F&8-F, city centre, near bus stand Hoshiyarpur-146001
19 Construction of Factory building for TI Cycles of India. Rajpura, Punjab  2500.00 TI Cycles of India
Post Bag No. 5, CTH Road,
Ambattur, Chennai.
18.04.2015 31.10.2016 TI Cycles of India
Post Bag No. 5, CTH Road,
Ambattur, Chennai.
20 Construction of residential at haridwar greens, Village Aneki Hetampur, Haridwar Uttarakhand consisting  of 13 Towers Nos, D-1, F-1 to F-5, V-12 to V-16 , U-02 & U-08 including finishing works school building. Nursery Wing, Under Ground water Tank and Infra works.   4,452.00 Hero Homes.(HERO REALTY PRIVATE LIMITED)
E-2 Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016
 11.06.2013 10.09.2016 Hero Homes.(HERO REALTY PRIVATE LIMITED)
E-2 Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016
21 Construction of civil and Road works for M/s Pure & Cure Healthcare Pvt Ltd. (G+3 Storeyed)   913.00 Pure & Cure Healthcare Pvt Ltd (Pure & Cure) Plot No. 27,28,29,30 Sector 8-A IIE Sidcul Haridwar  (Uttarakhand) 21.05.2015 30.09.2016 Pure & Cure Healthcare Pvt Ltd (Pure & Cure) Plot No. 27,28,29,30 Sector 8-A IIE Sidcul Haridwar  (Uttarakhand)
22 Construction of School Building at Haridwar Greens, Village Aneki, Hetampur, Haridwar, Uttarakhand   491.00 M/s BML Munjal Foundation
Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016
30.08.2013 27.08.2016 M/s BML Munjal Foundation
Qutab Hotel Complex, Shaheed Jeet Singh Marg, New Delhi-110016
23 Structural Repair & Renovation of ONGC Hospital at Dehradun (Uttarakhand)  1347.00 Oil And Natural Corporation Ltd. Department of civil engineering, Tel Bhavan, Dehradun
Mr. Rajesh Kumar Sankla, Chief Engineer
Contact No: 9410397009
 19.08.2013  06.08.2016 Oil And Natural Corporation Ltd. Department of civil engineering, Tel Bhavan, Dehradun
24 Construction of Residential Apartment (Pearls Paradise) at Dhoran Khas, Dehradun including Civil, Plumbing & Electrical works  2826.00
(Without Cement & Steel)
PACL LTD,
1-5 Upper Ground Floors, Antriksh Bhawan,
K.G Marg, New Delhi-110001
15.12.2011 30.11.2015 PACL LTD,
1-5 Upper Ground Floors, Antriksh Bhawan,  K.G Marg, New Delhi-110001
25 Civil Construction and Boundary Wall for Zapfen International at Plot No. 31A, Sector 11, IIE, Ranipur, Haridwar   819.58 Zapfen International
D-1 & D-2, Rajpur
Industrical Estate, Khasra
No. 117, Bhagwanpur,
Tehsil: Roorkee, Uttarakhand
13.06.2014 20.09.2015 Zapfen International
D-1 & D-2, Rajpur
Industrical Estate, Khasra
No. 117, Bhagwanpur,
Tehsil: Roorkee, Uttarakhand
26 Industrial Building for M/s. Prince Industries plot No. 5-B, 5-B1 I.I.E Ranipur Haridwar, U.K.   680.00 M/s Prince Industries
Plot No. 5-B, 5-B1 I.I.E. Ranipur, Haridwar, Uttarakhand
15.09.2013 31.01.2015 M/s Prince Industries
Plot No. 5-B, 5-B1 I.I.E. Ranipur, Haridwar, Uttarakhand
27 Civil & External work for CBU Yard   408.08 Mahindra & Mahindra Ltd
Automotaive  Sector
CECM   DEPT.
Akurli Road, Post  Box No. 8582
Kandivali  (East ) Mumbai
03.09.2014 02.01 2015 Mahindra & Mahindra Ltd
Automotaive  Sector
CECM   DEPT.
Akurli Road, Post  Box No. 8582
Kandivali  (East ) Mumbai
28 Construction of factory building for M/s Malik Lifesciences Pvt. Ltd.at Plot No. 16, Vardhman Industrial Estate
Village- Bahadurpursaini, Roorkee, Haridwar (UK)
  985.00 M/s Malik Lifesciences Pvt. Ltd.
Plot No-16, Vardhman Industrial Estate, Vill- Bhadarupur Saini Roorkee (U.K.)
27.12.2013 31.12.2014 M/s Malik Lifesciences Pvt. Ltd.
Plot No-16, Vardhman Industrial Estate, Vill- Bhadarupur Saini Roorkee (U.K.)
29 Civil construction work for M/s Translumina Therapeutics, Plot No. 12, Pharma City, Selaqui Industrial Area, Dehradun  321.00 Translumina Therapeutics
Ground Floor, Metro Tower, LSC, MOR Land, New Rajinder Nagar, New Delhi-110060
27.11.2013 26.10.2014 Translumina Therapeutics
Ground Floor, Metro Tower, LSC, MOR Land, New Rajinder Nagar, New Delhi-110060
30 Construction of Factory Building for M/s Hamilton Housewares P Ltd. at SIDCUL Haridwar   547.00 Hamilton Housewares Pvt. Ltd.
Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai
10.11.2011 30.09.2014 Hamilton Housewares Pvt. Ltd.
Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai
31 M/s Hindustan Zinc Ltd
Pantnagar metal plant at Plot No. 2,3 in Sector -14, SIDCUL, Pantnagar, Udhamsingh Nagar, Uttarakhand
 2464.00 M/s Hindustan Zinc Ltd
Yashad Bhawan, Udaipur, Rajasthan, India
26.05.2012 31.08.2013 M/s Hindustan Zinc Ltd
Yashad Bhawan, Udaipur, Rajasthan, India
32 Construction of proposed Jagran Law College Buildings/Campus
Dehradun
 1180.00 Jagran School of Law
Plot No. 3288 Gha, Village Shankarpur Hukumatpur, Vikas Nagar, Dehradun, Uttarakhand
24.04.2012 28.02.2013 Jagran School of Law
Plot No. 3288 Gha, Village Shankarpur Hukumatpur, Vikas Nagar, Dehradun, Uttarakhand
33 Civil, Structural and Plumbing works for Oral Dosage Formulation Facility of Jubilant Life Sciences Ltd at Roorkee, UK 500.00
(Without Cement & Steel)
Jubilant Life Sciences
Plot No. 1A, Sector 16A, Noida – 201301
18.08.2011 22.10.2012 Jubilant Life Sciences
Plot No. 1A, Sector 16A, Noida – 201301
34 Construction of the Grand Hotel at EC Road, Dehradun 389.00
(Without Cement & Steel)
The Grand Hotel
EC Road, Dehradun
Uttarakhand
01.05.2011 30.09.2012 The Grand Hotel
EC Road, Dehradun
Uttarakhand
35 Civil, plumbing and road work at Plot No. 1 Sector 1, NH-58, Vardhman Industrial Estate, Roorkee Distt., Haridwar,  850.00 Akums Drugs & Pharmaceuticals Limited.
Plot No. 19-20-21, Sector 6 A,
I.I.E., SIDCUL, Haridwar
12.08.2011 31.05.2012 Akums Drugs & Pharmaceuticals Limited.
Plot No. 19-20-21, Sector 6 A,
I.I.E., SIDCUL, Haridwar
36 Construction of  hostels and Residential blocks for M/s. Himgiri Nabh Vishwavidyalaya (Essel Group)  660.00 M/s. Himgiri Nabh Vishwavidyalaya (Essel Group)
Shishambada, Near SOS, Selaqui, Dehradun-246745
01.04.2011 31.03.2012 M/s. Himgiri Nabh Vishwavidyalaya (Essel Group)
Shishambada, Near SOS, Selakui, , Dehradun-246745
37 Construction of proposed Factory Cum Office Building at Plot C – 18, Sector – 67, at Noida for United Concepts and Solutions Pvt. Ltd.   528.00 M/s United Concepts & Solutins Pvt. Ltd., Plot C – 18, Sector – 67 at Noida 21.10.2010 31.03.2012 M/s United Concepts & Solutins Pvt. Ltd., Plot C – 18, Sector – 67 at Noida
38 Construction of proposed factory building for Kesho Packaging Pvt Ltd  at  Plot no. 38, Udyog Vihar, Greater Noida  860.00 Kesho Packaging Pvt. Ltd.
Plot No. 38, Udyog vihar, Greater Noida
14.05.2011 13.03.2012 Kesho Packaging Pvt. Ltd.
Plot No. 38, Udyog vihar, Greater Noida
39 Construction of factory building for Sterlite at Plot No 9, Vardhman Industrial Estate, Haridwar –24940   1,067.00 M/s Sterlite Optical Technologies Ltd Plot No 9, Vardhman Industrial Estate,  Haridwar –24940 20.10.2010 17.01.2012 M/s Sterlite Optical Technologies Ltd Plot No 9, Vardhman Industrial Estate,  Haridwar –24940
40 Construction of factory building for M/s  SBL Industries  Pvt. Ltd  900.00 M/s SBL Industries
Plot no. – 42, Sector-11 SIDCUL, Haridwar
01.03.2011 31.12.2011 M/s SBL Industries
Plot no. – 42, Sector-11 SIDCUL, Haridwar
41 Construction of Academic Block for Icfai Campus at Dehradun  1550.00 The Institute of Chartered Financial Analysts of India, 44, Nagarjune Hills, Hyderabad 01.12.2008 31.12.2011 The Institute of Chartered Financial Analysts of India, 44, Nagarjune Hills, Hyderabad
42 Construction of factory building for JNS Instrument Ltd. at  Plot No. 15, Industrial Park 4,Begampur, Haridwar   490.00 JNS Instrument Ltd,
Plot No. 4, Sector 3, IMT Manesar, Gurgaon
25.04.2009 15.05.2011 JNS Instrument Ltd,
Plot No. 4, Sector 3, IMT Manesar, Gurgaon
43 Construction of factory building for M/s Maxx Mobile Com munication Pvt. Ltd.   2,200.00 M/s Maxx Mobile communication
C-3 & D-12, Vardhman Industrial Estate, Haridwar
01.11.2009 30.06.2010 M/s Maxx Mobile communication
C-3 & D-12, Vardhman Industrial Estate, Haridwar
44 Costruction of Factory Building at Haridwar (Uttarakhad) for SKF India Ltd   1,150.00 SKF Limited
Sh. Datey, AB-16,
Basement, Safdarjung
Enclave, New Delhi-29
21.05.2009 30.06.2010 SKF Limited
Sh. Datey, AB-16,
Basement, Safdarjung
Enclave, New Delhi-29
45 Civil works for M/s Psychotropics India Ltd. at plot No. 46 & 49 Sector-6 a, IIE, SIDCUL Industrial Area, BHEL, Ranipur, Haridwar   400.00 Psychotropics India Ltd.
A-32, DLF, Sector- 11
Faridabad – 121006
01.08.2009 30.05.2010 Psychotropics India Ltd.
A-32, DLF, Sector- 11
Faridabad – 121006
46 Construction of Proposed factory building on Plot No. 11. Industrial Park-2, Village- Salempur Madood, Haridwar (UK)   1,000.00 Munjal Auto Industries Ltd
301, 3rd Floor, Galleria Tower, DLF Phase IV, Gurgaon-122002
10.06.2009 31.03.2010 Munjal Auto Industries Ltd
301, 3rd Floor, Galleria Tower, DLF Phase IV, Gurgaon-122002
47 M/s Himalayan Drugs Company  732.00 (Without Cement & Steel) Dr S Farooq, President,  Himalayan Drugs Company , 2 Turner Road Clement Town, Dehradun – 248002 01.10.2008 30.06.2009 Dr S Farooq, President,  Himalayan Drugs Company , 2 Turner Road Clement Town, Dehradun – 248002
48 Shri Mahant Indresh
Hospital & Mahant
College
 1200.00 Chairman Shri Guru Ram
Rai Trust Education
Mission, Patel Nagar,
Dehradun
11.11.2007 10.04.2009 Chairman Shri Guru Ram
Rai Trust Education
Mission, Patel Nagar,
Dehradun
49 Construction of data centre-II at Greater Noida for M/s Wipro Technologies Ltd 453
(Without Cost of Cement & Steel)
M/s  Wipro Limited,
Plot No. 2,3,4 – Knowledge Park-4, Greater  Noida, U.P.
02.12.2007 04.03.2009 M/s  Wipro Limited,
Plot No. 2,3,4 – Knowledge Park-4, Greater  Noida, U.P.
50 Construction of Factory Building for M/s Hamilton Housewares P Ltd. at SIDCUL Haridwar  290.00 Hamilton Housewares Pvt. Ltd.
Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai
01.06.2006 28.01.2007 Hamilton Housewares Pvt. Ltd.
Kaiser-I-Hind Building, 3rd floor, Currimbhoy Road, Ballard Estate, Mumbai